OPL 2010

Licence
OPL 2010
Interest
60%
Operator
Matrix E&P
Stage
Exploration — 3D seismic acquisition and processing
Location
Eastern Niger Delta
Terrain
Shallow offshore
Awarded
2024 farm-in from GPDC

Overview

OPL 2010 is located in the shallow offshore eastern Niger Delta, in water depths of approximately 70–100m. Matrix E&P holds a 60% participating interest and operatorship following its farm-in from GPDC and subsequent receipt of the required regulatory and Ministerial approvals.

The block has an established exploration history, with five wells previously drilled. Matrix E&P has advanced the asset into a new phase of exploration through the completion of a blockwide 3D seismic acquisition programme covering approximately 368 km² in full-fold coverage.

The acquired seismic data is currently being processed and will support further subsurface evaluation, prospect maturation and future exploration and development decisions.

OPL 2010 represents a strategic exploration opportunity within Matrix E&P's portfolio and provides potential for future portfolio growth as the Company progresses its subsurface evaluation and development programme.

368 km²

3D seismic, full-fold coverage

60%

Participating interest and operatorship

3 Tscf

In-place gas volume (GIIP), resources

60 MMstb

In-place oil volume (STOIIP), resources

5

Wells previously drilled on the block

Field timeline

OPL 2010, built up step by step

A shallow-offshore block in the eastern Niger Delta: earlier wells, the farm-in and approvals, then a blockwide 3D seismic survey. Scroll to turn the dial; the drawing builds with each milestone. Illustrative, not to scale.

History2024202520262026HistoryEarlier wells
1 / 5
Drilled
5 wells drilled1 of 5
History · Earlier wells

A block with exploration history

OPL 2010 lies in the shallow offshore eastern Niger Delta. The block has an established exploration history, with five wells previously drilled.

Milestones

  1. History

    Five wells previously drilled on the block.

  2. 2024

    Matrix E&P farms in from GPDC for a 60% interest and operatorship.

  3. 2025

    Ministerial Consent and operatorship received.

  4. 2026

    Blockwide 3D seismic programme completed — about 368 km² in full-fold coverage; data now being processed to support prospect maturation.

Facilities and arrangements

  • Blockwide 3D seismic dataset, about 368 km² full-fold
  • Operated directly by Matrix E&P
Block map of OPL 2010 off the Bayelsa, Rivers and Akwa Ibom coast, showing the Mbara-1, Nkere-1, Uwem-1, Udeme-1 and Idara-1 wells
OPL 2010 block map

OPL 2010

Working interest
60%
Operator
Matrix E&P
Stage
Exploration — 3D seismic acquisition and processing
Work Programme
Exploration
Location
Eastern Niger Delta · Shallow offshore
NigeriaPML 79PPL 211PPL 207
OPL 2010Shallow offshore
KeyProductionAppraisalDevelopmentExplorationPositions are indicative